-The project will occur between Rookery Way to just east of 3556 Shore Drive Condominium.
-The beach berm will be constructed to an elevation of +7.0 ft NAVD88.
-The beach berm width (the ‘recreational’ portion of the beach profile) will average 100ft.
-Sand will be placed as part of a dune restoration feature between Albemarle Ave. and Dinwiddie Rd.