Beach Replenishment Plans

Project Details

  1. The project will occur between Rookery Way to just east of 3556 Shore Drive Condominium.
  2. The beach berm will be constructed to an elevation of +7.0ft NAVD88.
  3. The beach berm width (the ‘recreational’ portion of the beach profile) will average 100ft.
  4. Sand will be placed as part of a dune restoration feature between Albemarle Ave. and Dinwiddie Rd.

If you are interested in looking at the Army Corp of Engineers Project Plans for a detailed picture of the replenishment project, you can download them with the link:

Here is an example of one of the drawings for part of the beach.

Ocean Park Beach Nourishment jpa-Permit-Drawings.pdf

3 thoughts on “Beach Replenishment Plans

Add yours

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Create a website or blog at WordPress.com

Up ↑

%d bloggers like this: