From Councilman Schulman:

“We’ve heard from many residents who have questions and concerns about the Pleasure House Point Wetlands Mitigation Bank project. Here are some things to know:

Community input is critical to the success of a project like this. Neighbors, area civic leagues, and local environmental organizations like Lynnhaven River Now, Chesapeake Bay Foundation, Friends of Live Oaks, Wetlands Watch, and our VBCPS Environmental Studies Program at the Brock (both staff and students) have all been alerted and are being kept informed and actively participating in the conversation around this project. I hope you will join us for the BAC meeting. If you can’t make it, please feel free to send me any thoughts or questions to jschulman@vbgov.com.

The project involves restoring 8 acres of the 12.3 acre project area to their previous natural state as wetlands. Prior to the 1970’s the project area existed in a natural condition as a partially wooded inlet with a broad expanse of wetlands. Between 1971 and 1972, the U.S. Army Corps of Engineers (as part of dredging the Lynnhaven Inlet) placed over one million cubic yards of dredge material over these wetlands.

The wetlands mitigation bank project was originally conceived in 2014 and went through 90% design and permitting in 2018 but was ultimately not completed due to a lack of funding and there was no compelling public need to justify the cost. These designs and construction plans were part of a larger comprehensive plan that was the result of much public participation.

There is now a compelling public need for the mitigation. This wetlands mitigation bank project will support the City’s critically important Flood Protection Program. The purpose of a Wetlands Mitigation Bank is to provide a way to offset wetlands losses that occur elsewhere in the same watershed, or “Hydraulic Unit Code Zone” (HUC Zone). The city, as part of its Flood Protection Program projects (like the Bow Creek Stormwater Park, Thalia Creek Tide Gate, Southern Rivers Watershed projects, and other road projects, in general) can cause impacts to wetlands. Under Federal and State law those impacts must be compensated for, to ensure no net loss of wetlands. There are no wetlands mitigation banks in our HUC Zone, and because of the public need associated with the multigenerational investments we are making in our Flood Protection Program, the need for this wetlands mitigation bank has become acute.

It’s important to note that the wetlands mitigation bank credits made available by this project are restricted for use with city/public projects only.Credits will NOT be available for private property owners or developers in connection with projects that impact wetlands on private property.

The process of converting highlands to lowlands, in this case, will involve a conversion from volunteer trees to valuable wetlands. I’ve asked that our City Arborist take an inventory of the trees in the area so we have a sense for the scope and so we can look for ways to minimize impact. Importantly, the wooded areas to the West of the project site are protected by a conservation easement.

The Pleasure House Point Natural Area (all 118 acres) will continue to be managed as a Natural Area Preserve by the City of Virginia Beach Department of Parks and Recreation. As part of the project, the city will be planting 600 trees. 336 of those trees will be Live Oaks and 129 trees will be Water Oaks. While all trees have value, Live Oaks and Water Oaks are hardwood trees with significantly more species value than Pine (which is what is mostly on-site currently).

There have been questions as to whether this plan involves a kayak launch. The project scope ONLY includes the wetlands mitigation bank, not a kayak launch. The concept of a launch needs to be more thoroughly and thoughtfully vetted, being mindful of the potential associated negative impacts of having a facility of that type on this property.”

Pleasure House Point Wetlands Mitigation Project

Lynnhaven River Now Executive Director, Karen Forget responded to questions raised by neighbors:

  1. Do you believe that this project will result in a net positive outcome for this natural area?

“Wetlands are our most threatened habitat and are critically important to the health and the marine life in the Lynnhaven River and the Chesapeake Bay. Most of our wetlands have been lost to development.  Wetlands were drained and canals dug to drain off the water to enable development of the land.
Bulkheads were installed severing the connection between the land and the water and drowning the wetlands.  Most of the remaining wetlands in the Lynnhaven are vulnerable to sea level rise either because they are unable to move upland because of development as the water levels rise or because they are part of our extensive marsh islands that are already eroding and are also vulnerable to drowning as water levels rise.
Much of Pleasure House Point was wetlands before the berm was built and it was used as a storage area for dredge material many decades ago.  Dredge material was piled on top of the wetlands creating the sandy areas that exist there today.”

2. Have you heard any reassurances that the city knows what it it doing in creating this wetland area? Is it difficult to create this kind of area?

    “This project will be permitted by the US Army Corps of Engineers and the Virginia Marine Resources Commission.  It is more complicated than simply excavating the sand, but this is restoration and is in a place where wetlands should be. Though I look forward to seeing more detailed plans than are available currently, I am confident that it will be well designed. These types of wetlands restoration have been done successfully in other places coastal Virginia.”

    3. Do you know what the “monitoring” consists of and who does it? What recourse is there if the area does not ‘take’ as a wetland’?

      “It is my understanding that City staff will do the monitoring.  Adjustments can be made if necessary to attain maximum functionality.”

      4. Is spoils dumping the only reason that the area filled in? Is there natural accumulation of sand etc from tidal activity.  Another words, will this fill in by itself? Will additional dredging be necessary? Which would disturb the habitat again?

        “It exists as it is today because the berm was built to hold in dredge material and dredge material was piled on top of the wetlands that naturally existed there.  It will not fill in again.”

        5. Does LRNow support this project?

        “LRNow is supportive of this project but is requesting the following:
           — The City Arborist or a contract arborist do an assessment of the trees that will be removed (number, approximate size, and species)
           — That the live oak at the corner of the project area be protected.
           — That the tree loss be mitigated at the same rate (1:1) as trees lost in other city projects.
           — That care be taken to move any existing diamondback terrapin nests in the construction area.
           — That a silt curtain and other devises be used to minimize any sediment entering the creek that could be detrimental to the thriving oyster population in Pleasure House Creek.

        We look forward to reviewing more detailed construction plans and offering comments if pertinent.  We also urge the City to provide a detailed construction schedule so that we can help the public be prepared for the changes that are coming and for any disruptions in the use of the property.”

        Thank You Generous Neighbors!

        CASA Outreach Coordinator Lenora Thompson received our gift cards ( so cold outside the court!) : “Please send a HUGE Thank You! to everyone that contributed financially, logistically and administratively.  And may you ALL have a safe/healthy and happy holiday season!” She said the volunteer advocates had been asking if there cards being donated and we are so pleased that we were able to contribute for every child! Thank you neighbors!

        The mission of the Virginia Beach CASA (Court Appointed Special Advocates) is to support and promote court-appointed volunteer advocacy so that every abused and neglected child can be safe, establish permanence and have the opportunity to thrive. CASA volunteers are appointed by judges to advocate for a child’s best interest. Volunteers undergo extensive training and do important work. Ocean Park has a long connection with CASA with neighbors serving on the CASA board and as hardworking case advocates.

        Lynnhaven Boat Ramp Activity Saturday Nov. 23

        LBR staff is aware of an incident last night (Sat Nov 23) and is reassessing efforts to mitigate over the off-season

        • Staff found evidence of tire marks in the trailer parking lot this morning.
        • Security footage shows a single car entering at 2:53 am and leaving at 3:00 am after doing donuts.
        • Staff is investigating additional actions (redeployment of speed bumps, perhaps).

        There was activity at the LBR Saturday evening November 9th. Here is what was reported:

        • Around 5:30 PM on Saturday, 10-12 cars and a couple of motorcycles arrived at the facility and parked in the trailer lot.
        • The vehicles were not revving engines, racing, or being loud; they were just parked and looking at each other’s cars.
        • A call was made to the 3rd precinct to request a patrol car.
        • Live video was monitored from 5:30 PM until 6:05 PM, during which no negative activities were observed.
        • As the cars were leaving, VBPD arrived and stayed until all vehicles had left.
        • Follow-up with 3rd precinct resulted in additional patrols being sent through the area for the rest of the evening.
        • Additional camera footage from 6 PM to midnight showed no further disturbances and VBPD was seen patrolling later in the evening 11PM

        November News

        At the November General Membership Meeting, City Councilman Joash Schulman joined us with several updates. Virginia Natural Gas will put in some improvements to the property on Shore Dr. Councilman Schulman related that VNG viewed this as a learning experience and regrets not involving the community prior to stripping the trees from the property. Mr. Schulman said there has been no activity about the Church property.

        President Danny Murphy had other updates:

        • Social Committee: Holiday Happy Hour on Dec. 6th 5-7 pm at Froggies
        • Social Committee: Holiday Lighted Bike Parade Dec. 7th more info TBD
        • Upcoming Meetings
        • Beach and Waterways Commission
        • Marlin Bay: new proposal on the way
        • Nominating Committee: elections postponed until December 5th Meeting.
        • Door Prize: Lendy’s on Shore Dr. gift card.
        Vote will happen at the December 5th meeting.

        Zoning 101: How Does it Work? Build What?When?

        What can be built in Virginia Beach ‘by right‘ -that is without any public input- and what development requires public hearing? Here is a quick and easy to understand presentation: By Right and Discretionary Zoning: that was recently briefed to the City Council by Kevin Kemp , Zoning Administrator and Kathy Warren, Planning Director (begins at minute 49). The discussion that follows by city council members is also interesting and an overhaul of the zoning code is mentioned to be undertaken (last done 1988 during a time of rapid growth). Councilwoman Barbara Henley’s remarks on B4 zoning origins and why it was used so much is very interesting.

        Planning Director Kathy Warren talks about the Monthly Land Use Report (this one is for October 2024). Monthly Land Use Reports are now included in the City Council Weekly Packet on the 3rd Friday of every month. Now this report will include a Meeting Log where the public can see who has been meeting with the Planning Department either for: Pre-submittal, Inquiry or Comment Review which gives a preview of upcoming development early on.

        Excerpts from Briefing:

        Full Briefing

        Plans for VNG Property on Shore Dr.

        Property after trees taken down

        Councilman Joash Schulman sends an update on the Virginia Natural Gas plan for the property on the corner of Shore Dr. and Dupont Circle. VNG purchased the property and then stripped it of the Live Oaks. Councilman Schulman has worked with VNG representatives to relay the community’s displeasure and as a result the company offers this beautification plan. He shares a rendering of what they intend to do. VNG met last week with the City Planning Department for a pre-construction meeting. Work will start in the next 2-3 weeks and last 3-4 days. Councilman Schulman invites anyone who has questions to contact him.

        Rendering of what complete project will look like.

        Join Friends of Live Oaks! Adopt a free Live Oak!

        Beach Built has generously given us a little space in their great little store! We still have t-shirts-short and long sleeve in both designs: short sleeve live oak ($15) and long sleeve live oak ($25) and our new short sleeve/sleeveless sunset design ($25). Great gift for college kids to remind them of home! Drop in to Beach Built on Shore Dr. next to Froggies and get your OP merch! Payment in cash or check can be accepted. (or use the QR code and a credit card). All proceeds go to the civic league.

        Blog at WordPress.com.

        Up ↑